January 5, 2026
Image default
Technology

European Space Agency’s Ariane 6 rocket passes key test

Europe has carried out profitable hot-firing checks of the Ariane 6 launcher and goals to launch its new-generation rocket “as quickly as doable” whereas sustaining a broad end-year goal, the European Area Company says.

Friday’s checks, carried out in near-vacuum situations at a facility in Germany, ran for as much as 975 seconds and got here as a “large reduction” after an earlier check was interrupted, ESA director of house transportation Daniel Neuenschwander mentioned.

The new-firing checks are one in all three most important hurdles earlier than launch, alongside mixed checks with the launcher in French Guiana and supply of {hardware}.

The rocket is being developed by ArianeGroup, co-owned by Airbus and Safran.

ESA won’t be able to offer a extra actual timetable for the debut till June, Mr Neuenschwander mentioned.

The present Ariane 5 model has two remaining launches within the first half.

The delayed launch of Ariane 6 is a vital step as Europe faces a spot in its entry to house after the usage of Russian Soyuz rockets was interrupted by the struggle in Ukraine and Italy’s Vega C was grounded following a launch failure final month.

“Let’s name it what it’s – a disaster with launchers in Europe,” ESA director common Josef Aschbacher instructed reporters.

A fee of inquiry into the Vega C failure is anticipated to difficulty its findings within the second half of February, he mentioned.

Mr Neuenschwander mentioned the Vega C downside had been targeted on the brand new second stage, including this meant the sooner Vega model might resume flights earlier than the affected Vega C mannequin.



Source link

Related posts

REDcycle stockpile destined for landfill in NSW

Richard

US, partner countries call for controls to counter misuse of spyware – Security

Richard

‘Reasonable’ doubts spark second Kathleen Folbigg inquiry

Richard

Leave a Comment