January 12, 2026
Image default
World News

West Gate Bridge works: Huge delays expected on Melbourne freeway from Boxing Day until January

Melbourne motorists are dealing with ‘important’ delays of greater than 90 minutes as upkeep works start on the West Gate Bridge.

From Monday evening, there might be enormous disruptions for motorists all through the community because the bridge goes down to 1 outbound lane and the works will final for greater than per week.

Motorists have been urged to plan forward and detour early if they’re touring across the metropolis.

For extra Journey associated information and movies try 7 Travel >>

Delays are anticipated on the West Gate Freeway between the CBD and the West Gate Bridge, the Area Tunnel, the Monash Freeway inbound and on surrounding roads via the CBD, Docklands, Southbank, South Melbourne and South Yarra.

Drivers heading to Melbourne Airport can even be affected if they’re making an attempt to achieve CityLink and the Bolte Bridge from the Monash Freeway or Area Tunnel.

The disruptions begin from 9pm on Boxing Day and can proceed till 5am on January 4.

The Division of Transport has mentioned delays of greater than 90 minutes are anticipated.

The best way to keep away from lengthy delays

Those that are headed to Melbourne Airport through the annual upkeep works on the West Gate Bridge ought to contemplate detouring east and north of the CBD.

They will attain CityLink from Mt Alexander or Brunswick Rd or from Bell St.

Holidaymakers are additionally urged to have a look at detouring if they’re touring to the Bellarine Peninsula, Surf Coast, south western or western Victoria from the east of town.

They need to as a substitute go north of the CBD through the use of Alexandra Pde, Racecourse Rd or Geelong Rd to attach with the Princes Freeway.

They will then attain the Western Freeway.

Motorists touring to town from the western suburbs for any cause through the subsequent 9 days ought to contemplate public transport.

These coming from the east have additionally been inspired to take public transport, or use main roads via the jap suburbs to keep away from congestion on the Monash Freeway.

The works on the West Gate Bridge are to switch the waterproofing membrane in addition to resurfacing and line marking.

Second driver makes an attempt to run over pedestrian.

Second driver makes an attempt to run over pedestrian.

Source link

Related posts

‘Agitated’ man dies at Queensland restaurant after customers restrain him

Richard

2023 Alpina B5 GT revealed as firm’s most powerful model yet

Richard

Win the chance to see Harry Styles perform live in London!

Richard

Leave a Comment